ABOUT US
Integrated Fire Protection Service
Nohmi Bosai's mission is to ensure that people have effective fire protection so they can enjoy safe and comfortable lives.To this end, we have established an intergrated series of services that assumes consistent responsibility for giving customers the best fire protection system for their needs.
Research and Development
Simulation experiments are performed in Nohmi Bosai's laboratories to enable the Company to develop fire alarm and extinguishing systems that provide an optimum degree of fire protection for the customer.
Risk Analysis
The first step in providing fire protection is to understand the customer's specific requirements. Nohmi Bosai conducts detailed analyses of the customer's premises to evaluate important environmental factors and potential fire hazards.
Consultation and System Design
Information obtained from simulation experiments and client consultation is important for both designing and developing customized fire protection systems.
Manufacturing and Quality Assurance
All of Nohmi Bosai's products are manufactured under a strict quality control system. Evidence of our commitment to quality is the certification of our Menuma factory under ISO 9002- an internationally recognized standard for quality systems.
Installation
After designing an appropriate fire protection system, our specialists install the new system. Nohmi Bosai's abundant experience in installing fire protection systems ensures that work proceeds quickly and smoothly.
Commissioning
The commissioning stage is vital. At project completion, our specialists conduct a thorough inspection of the newly installed fire protection system to ensure that all fire alarm and extinguishing systems are working properly. The results of this inspection are then explained to the customer.
Maintenance
Nohmi Bosai's maintenance service give customers extra safety assurance. We ensure that existing systems work properly. Also, we check the appropriateness of existing systems in the event of a change in the occupancy or installation conditions of a building.